Financial Services · Moraph software

IFRS 9 / CECL Impairment Calculator

Estimate expected credit losses, document every assumption, and close the allowance with evidence

At a glance

For
Controllers and accounting teams who own the allowance for credit losses
What it does
Prepare data → Estimate → Adjust and review → Approve and report
Type and deployment
Moraph software, running in Moraph Apps. Moraph cloud, With a managed service.
Availability
Generally available. What this means Release notes
Works alongside
Core banking and loan servicing, General ledger, Economic forecasts, Investment accounting and 4 more

Request a demonstration See the walkthrough

What it does not do

  • The Calculator produces an estimate; the allowance recorded in your financial statements is your institution's judgment, approved by your own controller and committee.
  • Estimates depend on the quality and length of the loss history and portfolio data you provide. Where your own history is limited, peer or proxy data must be sourced and justified by you.
  • It does not produce economic forecasts. You supply scenarios from your chosen provider or your own economists.

All 8 limitations

Overview

What you are buying

The IFRS 9 / CECL Impairment Calculator estimates expected credit losses on your loan portfolios from your own loss and vintage history, the PDs and LGDs you supply, qualitative adjustments and the economic scenarios you approve. It offers loss rate, WARM, vintage and PD × LGD × EAD methods with IFRS 9 staging, and keeps the data, model results, qualitative adjustments and approvals for each period together. Your finance team proposes the allowance and your committee approves it, with a record auditors and examiners can follow.

The problem it solves

Many institutions calculate the allowance in spreadsheets linked to loan extracts, with loss rates, forecast assumptions and qualitative adjustments maintained by one or two people. Each quarter-end the data is rebuilt by hand, small changes ripple through formulas nobody fully reviews, and the reasoning behind an adjustment lives in a memo written after the number was chosen. When auditors or examiners ask how a figure was reached, the team reconstructs it rather than showing it.

  • Portfolio data is pulled and reconciled to the general ledger by hand every period
  • Loss rates, forecasts and reversion assumptions sit in spreadsheets with little version control
  • Qualitative adjustments are hard to tie back to the evidence that supports them
  • Audit and exam requests mean rebuilding last quarter's calculation from scratch
Who uses it and related requirements

Who uses it

  • Controllers and accounting teams who own the allowance for credit losses
  • Credit risk analysts who build loss estimates and forecasts
  • Allowance and audit committees who approve the period's estimate
  • Model risk teams who validate the methods and assumptions
  • Internal and external auditors and examiners, who need to follow each figure to its source

Related requirements

FASB ASC 326, Financial Instruments: Credit Losses (CECL)IFRS 9 Financial Instruments, Section 5.5 ImpairmentIFRS 7 Financial Instruments: Disclosures (credit risk)Interagency Policy Statement on Allowances for Credit LossesRevised Guidance on Model Risk Management (SR 26-2, which replaced SR 11-7 in April 2026)SEC Staff Accounting Bulletin No. 119

Listing a requirement here is not a statement that the product meets it; meeting it remains your organization's responsibility.

See how it works

A short walkthrough

Illustrative screens with fictional sample data. They show the workflow, not any client’s data or configuration, and the layout of the product itself differs. A live demonstration uses the product with sample data.

  1. Step 1

    The period close

    Each period starts from a checklist that shows where the allowance close stands and who signed off each step.

    StepOwnerStatusSign-off
    Load period dataAllowance accountantCompleteSigned
    Reconcile to general ledgerAllowance accountant2 differences openPending
    Run quantitative estimateCredit risk analystCompleteSigned
    Qualitative adjustmentsAllowance accountantIn reviewPending
    Committee approvalAllowance committeeNot startedPending
    Lock periodControllerNot startedPending
    Each period starts from a checklist that shows where the allowance close stands and who signed off each step.
  2. Step 2

    A pool's estimate

    Each pool shows its method, its loss history, the forecast applied and the resulting estimate.

    Commercial real estate, non-owner occupied · Sample quarter

    Method
    Vintage loss rate
    Amortized cost
    $412.6M
    Historical loss rate (lifetime)
    1.84%
    Forecast adjustment
    +0.31%
    Qualitative adjustment
    +0.12% (in review)
    Estimated allowance
    $9.6M

    Assumptions applied

    • Forecast period and reversion as set in the approved assumption library
    • Weighted across baseline, adverse and upside scenarios
    • Three loans individually assessed and excluded from the pool
    Each pool shows its method, its loss history, the forecast applied and the resulting estimate.
  3. Step 3

    Cohort history

    Loss experience is tracked by origination cohort, so the loss curve behind each rate can be inspected.

    Origination yearOriginal balanceCumulative net lossesLoss rate to dateStatus
    Cohort A (fictional)$118.0M$2.4M2.03%Seasoned
    Cohort B (fictional)$96.5M$1.6M1.66%Seasoned
    Cohort C (fictional)$134.2M$1.1M0.82%Maturing
    Cohort D (fictional)$88.9M$0.3M0.34%Limited history
    Cohort E (fictional)$102.7M$0.0M0.00%Limited history
    Loss experience is tracked by origination cohort, so the loss curve behind each rate can be inspected.
  4. Step 4

    A qualitative adjustment

    Each adjustment is tied to a policy factor, with the rationale and evidence, and a reviewer who is not the preparer.

    QA-118 · Commercial real estate, non-owner occupied

    Factor
    Concentrations of credit
    Direction
    Increase
    Amount
    +0.12% of pool balance
    Prepared by
    Allowance accountant
    Reviewer
    Controller
    Status
    Awaiting review

    Supporting evidence

    • Concentration report for the sample quarter (attached)
    • Office property exposure above the policy guideline
    • Credit committee minutes referencing the exposure (attached)
    Each adjustment is tied to a policy factor, with the rationale and evidence, and a reviewer who is not the preparer.
  5. Step 5

    Explaining the movement

    The change from the prior period is broken into its drivers before it goes to committee.

    DriverEffect on allowanceMain pools affected
    Prior period allowance$38.2MAll
    Portfolio growth and mix+$1.1MConsumer auto, CRE
    Credit quality migration+$0.7MCommercial and industrial
    Economic forecast+$0.9MCRE, residential mortgage
    Qualitative adjustments+$0.5MCRE
    Net charge-offs-$0.8MConsumer auto
    Proposed allowance$40.6MAll
    The change from the prior period is broken into its drivers before it goes to committee.
  6. Step 6

    Approval and lock

    The period's approvals are recorded in order, and the locked period can be rerun to reproduce the same figures.

    Sample quarter · Allowance approval

    1. Data reconciled to the general ledger and signed offAllowance accountant
    2. Quantitative estimate run and reviewedCredit risk analyst
    3. Qualitative adjustments acceptedController
    4. Proposed allowance approved for committeeController
    5. Allowance approved, one question recorded and answeredAllowance committee
    6. Period locked and journal entry exportedController
    The period's approvals are recorded in order, and the locked period can be rerun to reproduce the same figures.

In the product

Annotated screens

The current build, with sample data. Select a numbered marker to read what it shows; the same notes are listed under the screen.

IFRS 9 / CECL Impairment Calculator in Moraph Apps: the product home for a sample organization, with the Expected credit losses panel; counts for active pools, latest reporting date, adjustments to review, runs awaiting sign-off; workflow stages (Loan pools: Draft, Active, Retired). All names and values are sample data.
IFRS 9 / CECL Impairment Calculator as it runs in the current build of Moraph Apps, with sample data (build d889d9719, 2026-11-08). Records, names and figures are placeholders, not client data.
Notes on this screen (4)
  1. Product navigation This product’s own pages, then the records, tasks, calendar, search and activity every Moraph product shares.
  2. Expected credit losses Results are an estimate from your own data, methods and settings. They make no claim to satisfy ASC 326 or IFRS 9: your institution’s methodology and judgement decide the allowance.
  3. New loan pool Creates a record in this product. A person fills it in; the product checks it against its rules before saving.
  4. Your work Open tasks, records assigned to you, overdue records and open records in this product, counted from its records.

Workflows

The principal workflows

  1. Prepare data

    Loan and charge-off data extracted from your core and servicing systems is loaded for the period by CSV or the Work API, checked for completeness and reconciled to the general ledger before any estimate is run.

    5 steps
    • Period-end loan and commitment data is loaded by CSV or sent through the Work API
    • Balances are reconciled to general ledger control accounts and differences listed
    • Data quality checks flag missing days past due and grades, inconsistent PDs and large balance changes
    • Charge-offs and recoveries are added to the historical cohort history
    • The period's data is locked once its calculation run is signed off
  2. Estimate

    Each pool is estimated with the method you have chosen for it: loss rates over the remaining life, WARM, vintage loss rates, or PD × LGD × EAD from the PDs and LGDs you supply, with your approved scenarios' loss multiplier applied.

    5 steps
    • Loans are grouped into pools by shared risk characteristics
    • Historical loss experience is calculated by cohort and pool
    • Your scenarios' weighted loss multiplier is applied over the forecast periods, then reverted to historical experience
    • Under IFRS 9, exposures are staged and 12-month or lifetime losses calculated
    • Individually assessed loans are estimated separately with their own support
  3. Adjust and review

    Qualitative adjustments are entered against the factors your policy lists, each with its rationale and supporting evidence, and reviewed by someone other than the person who proposed it.

    5 steps
    • Preparer proposes qualitative adjustments by pool and factor
    • Each adjustment records its direction, amount, rationale and attachments
    • Sensitivity runs show the effect of alternative forecasts and assumptions
    • A reviewer accepts or returns each adjustment with comments
    • Changes from the prior period are explained in a movement analysis
  4. Approve and report

    The proposed allowance is signed off by someone other than the person who calculated it, and goes to your committee with the movement analysis and supporting reports. Once signed off, the reporting date is locked and the journal entry and disclosure data are exported.

    5 steps
    • Committee pack generated from the approved calculations
    • A second person signs off the run, and a product administrator records the committee's decision: approved or returned with questions
    • Journal entry file exported for your general ledger
    • Disclosure and regulatory report data produced from the locked period
    • The period is locked and can be reproduced as of that date

Roles and permissions

Who does what in the product

Your organization's administrators and technical leads give each person one of the roles below in the Moraph Portal under People and access. Each time someone's product access is given, changed or removed, it is recorded in the product's Activity.

Show each role and the permissions matrix

Viewer

People who need to see the allowance work without changing it, such as allowance committee members, internal and external auditors and examiners

Sees the workspace without changing it.

Sees

  • Every pool, exposure, history, scenario, adjustment, reconciliation, run, assumption change and validation finding in the workspace
  • Runs, the committee pack, movement analysis, disclosures and reports
  • Tasks and progress across the workspace

Does

  • Reads runs, reports and the committee pack
  • Downloads reports as CSV files

Cannot

  • Add, change or move records, load data, calculate, review, sign off or approve anything
  • Change Staging rules or the workspace settings
Approvals
None.
Notified about
Nothing by default.

User

Credit risk analysts, allowance accountants, and model validators who record findings

Does the day-to-day work of the period close: tasks, records and workflow steps.

Sees

  • Every pool, exposure, history, scenario, adjustment, reconciliation, run, assumption change and validation finding in the workspace
  • Their own tasks and the rest of the team's

Does

  • Loads exposures and loss history, adds pools, scenarios, individually assessed loans and GL reconciliations
  • Proposes qualitative adjustments and assumption changes, and scores the qualitative scorecard
  • Accepts or returns qualitative adjustments, reconciles GL reconciliations and assesses individually assessed loans that someone else prepared
  • Calculates runs and sensitivity runs, explains large movements, and signs off or rejects a run someone else calculated
  • Records validation findings and their responses, and closes findings they raised

Cannot

  • Accept an adjustment, reconcile a reconciliation or assess an individually assessed loan that they created or changed
  • Sign off or reject a run they calculated
  • Approve economic scenarios or decide assumption changes
  • Close a validation finding someone else raised, or one whose response they wrote or changed
  • Record the committee's decision, supersede a signed-off run, or enter peer rates
  • Change Staging rules or the workspace settings
Approvals
Accepts or returns qualitative adjustments, reconciles GL reconciliations and assesses individually assessed loans, each only when someone else prepared it; signs off runs someone else calculated.
Notified about
When a record or task is assigned to them, and when work assigned to them is due soon or overdue.

Product administrator

The people who run the product for your institution, such as the controller or allowance lead

Everything a User can do, plus the product's settings and reference data.

Sees

  • Every pool, exposure, history, scenario, adjustment, reconciliation, run, assumption change and validation finding in the workspace
  • Staging rules and the workspace settings
  • Recently deleted records

Does

  • Approves economic scenarios and approves or rejects assumption changes
  • Records the allowance committee's decision on a signed-off run
  • Supersedes a signed-off run with a reason, so the reporting date can be corrected
  • Closes any validation finding
  • Sets Staging rules and enters peer loss rates
  • Changes the workspace's record types, fields and workflow stages, manages Work API keys and restores deleted records

Cannot

  • Give people access to the product or change their roles: your organization's administrators and technical leads do that in the Moraph Portal under People and access
  • Approve a scenario or decide an assumption change that they entered or changed
  • Record the committee's decision on a run they calculated
  • Close a validation finding whose response they wrote or changed
  • Accept, reconcile, assess or sign off anything they prepared, under the same rules as Users
Approvals
Everything a User approves, under the same rules; approves economic scenarios and decides assumption changes that someone else entered; records the committee's decision on runs someone else calculated.
Notified about
When a record or task is assigned to them, and when work assigned to them is due soon or overdue.

Permissions at a glance

ActionViewerUserProduct administrator
See every record, run, report and task in the workspaceFullFullFull
Load data and add pools, scenarios, reconciliations and individually assessed loansNo accessFullFull
Propose qualitative adjustments and assumption changesNo accessFullFull
Accept an adjustment, reconcile, or assess a loan that someone else preparedNo accessApprovesApproves
Calculate runs and sensitivity runsNo accessFullFull
Sign off or reject a run someone else calculatedNo accessApprovesApproves
Approve economic scenarios and decide assumption changes someone else enteredNo accessNo accessApproves
Record the committee's decision on a run someone else calculatedNo accessNo accessApproves
Supersede a signed-off runNo accessNo accessFull
Record validation findings and responsesNo accessFullFull
Close a validation finding (Users: only ones they raised; never one whose response they wrote)No accessOwn work onlyFull
Change Staging rules and enter peer ratesNo accessNo accessFull
Change the workspace settings and Work API keys, and restore deleted recordsNo accessNo accessFull
Give people access and roles (in the Moraph Portal, by your organization's administrators and technical leads)No accessNo accessNo access
  • Full
  • Own work only
  • Approves
  • No access

How access is controlled

  • Nobody approves their own work: adjustments, reconciliations and individually assessed loans are accepted by someone other than the person who prepared or changed them, runs are signed off by someone other than the person who calculated them, and scenarios and assumption changes are approved by a product administrator who didn't enter them. These checks are always on.
  • Requiring reconciliations before sign-off and the committee's approval before the journal entry file are Staging rules, off until a product administrator turns them on.
  • Roles are given to each person by your organization's administrators and technical leads in the Moraph Portal under People and access.
  • Each time someone's product access is given, changed or removed, it is recorded in the product's Activity.
  • Auditors, examiners and committee members can be given the Viewer role, which sees everything and changes nothing.

Features

What it does

Cohort and vintage analysis

Historical losses tracked by origination cohort and pool, so loss curves come from your own experience rather than a spreadsheet rebuilt each quarter.

Multiple estimation methods

Remaining-life loss rate, WARM, vintage and PD × LGD × EAD methods chosen per pool and documented with the reason, plus your own discounted cash flow results for individually assessed loans.

IFRS 9 staging

Stage 1, 2 and 3 assignment from your significant-increase-in-credit-risk criteria, with 12-month and lifetime losses calculated and stage movements explained.

Forecast scenarios and reversion

Enter your economic scenarios as weights and loss multipliers, set the forecast and reversion periods, and see the effect of alternatives in sensitivity runs.

Qualitative adjustments with evidence

Each adjustment is tied to a policy factor and a pool, with its rationale, attachments, preparer and reviewer recorded.

General ledger reconciliation

Loan balances reconciled to GL control accounts before estimation, with differences listed and signed off.

Sensitivity analysis

Run the estimate under alternative forecasts, weightings and assumptions and keep the results with the period.

Movement analysis

The change in the allowance from the prior period broken down into volume, forecast, loss rate, qualitative and individually assessed effects.

Individually assessed loans

Collateral-dependent and other individually assessed loans estimated separately, with appraisals and support attached.

Period lock and reproduction

Each approved period is locked with its data, settings and results, and can be rerun as of that date to produce the same figures.

Assumption library

Pools, methods, forecast periods, reversion settings and qualitative factors versioned, with who changed them and when.

Committee and disclosure packs

Committee reporting, disclosure tables and regulatory report data produced from the same approved figures.

Reporting

What you can report on

12 standard reports, grouped by who uses them. Each shows who it is for, how it can be broken down, how it is delivered and what it is used for. The data behind them is also available to your own reporting tools.

Show all 12 reports

Period close

Data reconciliation

For allowance accountants and the controller

Loan and commitment balances loaded for the period against general ledger control accounts, with each difference and its explanation.

Break down by
GL account, Portfolio, Legal entity, Difference status
Delivered as
Reconciliation page; records CSV export
Used for
Confirming the estimate starts from complete, reconciled data.

Data quality exceptions

For allowance accountants and credit risk analysts

Exposures with missing days past due or grades, inconsistent PDs, EAD or original amounts, zero balances or large balance changes.

Break down by
Exception type, Portfolio, Source system, Resolution
Delivered as
Live view; CSV export
Used for
Clearing data issues before estimation and evidencing how they were handled.

Close checklist status

For controller and allowance accountants

Each step of the period close, from data load to lock, with its owner, status and sign-off.

Break down by
Step, Owner, Status, Legal entity
Delivered as
Live dashboard
Used for
Keeping the allowance close on track and showing who signed off each step.

Management and committee

Allowance summary

For controller, allowance committee, senior management

The allowance and coverage ratio by pool, with the quantitative estimate, qualitative adjustments and individually assessed amounts shown separately.

Break down by
Pool, Stage (IFRS 9), Legal entity, Period
Delivered as
Run page; printable committee pack; CSV export
Used for
Presenting the proposed allowance for approval.

Allowance movement analysis

For controller and allowance committee

The change in the allowance since the prior period broken down into volume, forecast, loss rate, qualitative and individually assessed effects, with a rollforward of charge-offs.

Break down by
Driver, Pool, Period, Legal entity
Delivered as
Run page; printable committee pack
Used for
Explaining why the allowance moved, in terms the committee and auditors can follow.

Scenario sensitivity

For controller, allowance committee, chief risk officer

The estimate under each economic scenario and alternative assumption, compared with the weighted result used.

Break down by
Scenario, Pool, Assumption, Period
Delivered as
In the product, printable; record CSV export
Used for
Understanding how much the estimate depends on the forecast and key judgments.

Regulatory and disclosure

Disclosure tables

For financial reporting team and auditors

Allowance roll-forwards, credit quality by vintage, and IFRS 9 stage movements from the locked period, laid out for your financial statement notes.

Break down by
Portfolio segment, Vintage year, Stage, Credit quality indicator
Delivered as
CSV and spreadsheet export
Used for
Preparing ASC 326 or IFRS 7 disclosures from the same figures that were approved.

Regulatory report data

For regulatory reporting team

Allowance, provision and charge-off figures mapped to the loan categories used in your regulatory reports.

Break down by
Report line, Loan category, Period
Delivered as
CSV export; Work API
Used for
Feeding Call Report or other regulatory schedules without re-keying.

Audit trail extract

For internal audit, external auditors and examiners

Who loaded, changed, proposed, reviewed and approved what for a selected period, pool or adjustment.

Break down by
Period, Record, User, Action
Delivered as
Activity page; CSV export for product administrators
Used for
Answering audit and exam requests for evidence without assembling it by hand.

Model governance

Assumption change history

For controller, model validators, auditors

Every change to pools, methods, forecast settings, reversion and qualitative factors, with who proposed it, who approved it where an assumption change was needed, and the first period it applied to.

Break down by
Assumption type, Pool, Approver, Effective period
Delivered as
In the product, printable; record CSV export
Used for
Showing that methodology changes were deliberate, approved and documented.

Back-testing

For model validators and credit risk analysts

Each signed-off run's collective allowance compared with the net charge-offs recorded for later periods, by pool.

Break down by
Pool, Cohort, Estimate period, Method
Delivered as
Live view; CSV export
Used for
Testing whether methods and assumptions are performing as intended.

Validation findings

For model validators, controller, chief risk officer

Open and closed findings on the allowance models, with severity, owner, response and status.

Break down by
Model, Severity, Owner, Status
Delivered as
Live dashboard; CSV export
Used for
Tracking model issues through to resolution.
Exports, access and evidence
  • Run lines, disclosures and the journal entry export to CSV, and the committee pack and evidence pack print from the browser. Reports are opened in the product when needed.
  • Reports are chosen by reporting date or run, and the records list keeps saved views for each person. Reports that need a different shape can be built in your own tools from the data described below.
  • Period results, adjustments and approvals are available through the Moraph Work API, and can be read into your data warehouse or business intelligence tool alongside other finance and risk data.
  • Reports are open to everyone with access to the Calculator, and auditors and examiners can be given read-only Viewer access; disclosure tables break figures down by each pool's legal entity.
  • A signed-off run is a hash-checked snapshot, so its reports give the same result each time. Exporting a file is itself recorded in the activity log.

Integrations

The systems it works alongside

IFRS 9 / CECL Impairment Calculator: related requirements and the systems it connects toRelated requirementsWorks alongsideIFRS 9 / CECL Impairment…FASB ASC 326, Financial Instruments: Credit Losses (CECL)FASB ASC 326, Financial Instruments: Credit Losses (CECL)IFRS 9 Financial Instruments, Section 5.5 ImpairmentIFRS 9 Financial Instruments, Section 5.5 ImpairmentIFRS 7 Financial Instruments: Disclosures (credit risk)IFRS 7 Financial Instruments: Disclosures (credit risk)Interagency Policy Statement on Allowances for Credit LossesInteragency Policy Statement on Allowances for Credit LossesModel risk management guidance (SR 26-2): Revised Guidance on Model Risk Management (SR 26-2, which replaced SR 11-7 in April 2026)Model risk management guidance (SR 26-2)SEC Staff Accounting Bulletin No. 119SEC Staff Accounting Bulletin No. 119Core banking and loan servicing: Loan, commitment, risk grade, PD and LGD data from your core system's extract, loaded by CSV each reporting date or sent through the Work API.Core banking and loan servicingGeneral ledger: Control account balances entered for reconciliation, and a journal entry file for the approved allowance that your team posts.General ledgerEconomic forecasts: Scenarios from the forecast provider you already use or your own economists, entered with their weight and the loss multiplier your analysis supports.Economic forecastsInvestment accounting: Not connected: the Calculator has no securities methods, fair values or ratings. Positions your policy pools like loans can be loaded as exposures by CSV.Investment accountingSign-in: Staff sign in with their Moraph account, using email and password and, optionally, two-step verification. Sign-in through your own identity provider (SAML or OpenID Connect) is not offered.Sign-inModel risk management: Pool settings, assumption changes and validation findings are available through the Work API and record exports for your model inventory; nothing is sent to another product.Model risk managementRegulatory reporting: Allowance figures by the reporting category set on each pool, exported as CSV for your Call Report or 5300 Call Report team; nothing is filed or sent automatically.Regulatory reportingWork API: Period results, adjustments and status available to your data warehouse and reporting tools through the Moraph Work API.Work API

Related requirements

  • FASB ASC 326, Financial Instruments: Credit Losses (CECL)
  • IFRS 9 Financial Instruments, Section 5.5 Impairment
  • IFRS 7 Financial Instruments: Disclosures (credit risk)
  • Interagency Policy Statement on Allowances for Credit Losses
  • Model risk management guidance (SR 26-2)
  • SEC Staff Accounting Bulletin No. 119

IFRS 9 / CECL Impairment Calculator

Works alongside

Each requirement links to its requirement page and each system to the integrations directory. Meeting a requirement remains your organization’s responsibility.
The diagram as a list

Related requirements

  • FASB ASC 326, Financial Instruments: Credit Losses (CECL)FASB ASC 326, Financial Instruments: Credit Losses (CECL)
  • IFRS 9 Financial Instruments, Section 5.5 ImpairmentIFRS 9 Financial Instruments, Section 5.5 Impairment
  • IFRS 7 Financial Instruments: Disclosures (credit risk)IFRS 7 Financial Instruments: Disclosures (credit risk)
  • Interagency Policy Statement on Allowances for Credit LossesInteragency Policy Statement on Allowances for Credit Losses
  • Model risk management guidance (SR 26-2)Revised Guidance on Model Risk Management (SR 26-2, which replaced SR 11-7 in April 2026)
  • SEC Staff Accounting Bulletin No. 119SEC Staff Accounting Bulletin No. 119

Works alongside

  • Core banking and loan servicingCore banking and loan servicing: Loan, commitment, risk grade, PD and LGD data from your core system's extract, loaded by CSV each reporting date or sent through the Work API.
  • General ledgerGeneral ledger: Control account balances entered for reconciliation, and a journal entry file for the approved allowance that your team posts.
  • Economic forecastsEconomic forecasts: Scenarios from the forecast provider you already use or your own economists, entered with their weight and the loss multiplier your analysis supports.
  • Investment accountingInvestment accounting: Not connected: the Calculator has no securities methods, fair values or ratings. Positions your policy pools like loans can be loaded as exposures by CSV.
  • Sign-inSign-in: Staff sign in with their Moraph account, using email and password and, optionally, two-step verification. Sign-in through your own identity provider (SAML or OpenID Connect) is not offered.
  • Model risk managementModel risk management: Pool settings, assumption changes and validation findings are available through the Work API and record exports for your model inventory; nothing is sent to another product.
  • Regulatory reportingRegulatory reporting: Allowance figures by the reporting category set on each pool, exported as CSV for your Call Report or 5300 Call Report team; nothing is filed or sent automatically.
  • Work APIWork API: Period results, adjustments and status available to your data warehouse and reporting tools through the Moraph Work API.
How data moves with each system (8)
Works alongsideHowWhat flows
Core banking and loan servicingLoan, commitment, risk grade, PD and LGD data from your core system's extract, loaded by CSV each reporting date or sent through the Work API.In: period-end loan and commitment records, risk grades, PDs and LGDs, and net charge-offs by period.
General ledgerControl account balances entered for reconciliation, and a journal entry file for the approved allowance that your team posts.In: GL control balances entered by staff. Out: journal entry file for the approved allowance.
Economic forecastsScenarios from the forecast provider you already use or your own economists, entered with their weight and the loss multiplier your analysis supports.In: scenario weights and loss multipliers by reporting date.
Investment accountingNot connected: the Calculator has no securities methods, fair values or ratings. Positions your policy pools like loans can be loaded as exposures by CSV.In: exposures by CSV only; no security positions, fair values or ratings.
Sign-inStaff sign in with their Moraph account, using email and password and, optionally, two-step verification. Sign-in through your own identity provider (SAML or OpenID Connect) is not offered.None: accounts are kept in Moraph
Model risk managementPool settings, assumption changes and validation findings are available through the Work API and record exports for your model inventory; nothing is sent to another product.Out: pool settings, assumption changes, run totals and validation findings.
Regulatory reportingAllowance figures by the reporting category set on each pool, exported as CSV for your Call Report or 5300 Call Report team; nothing is filed or sent automatically.Out: approved allowance and provision data by reporting category.
Work APIPeriod results, adjustments and status available to your data warehouse and reporting tools through the Moraph Work API.Out: estimates by pool and stage, adjustments, approvals and period status.

The product doesn’t connect to these systems itself: data moves through the Moraph Work API, CSV import, exports or staff entry, as each row says.

Security and evidence

How your data is protected

Sign-in

Staff sign in with their Moraph account, using email and password and, optionally, two-step verification.

Role-based access

What each person can do follows their Moraph Apps role; preparing an adjustment is separate from accepting it.

Locked periods

Approved periods cannot be changed without a recorded reopening, so reported figures stay tied to the data and settings that produced them.

Encryption and keys

Client data is encrypted.

Complete audit trail

Every data load, setting change, adjustment, approval and export is logged with the person and time, and each run is kept as a hash-checked snapshot.

Data residency

Data is hosted on Cloudflare's network, in a database that is not restricted to a jurisdiction.

The evidence trail

What IFRS 9 / CECL Impairment Calculator records, and the reports that show it to a reviewer.

  1. Recorded

    Complete audit trail

    Every data load, setting change, adjustment, approval and export is logged with the person and time, and each run is kept as a hash-checked snapshot.

  2. Change record

    Assumption change history

    Every change to pools, methods, forecast settings, reversion and qualitative factors, with who proposed it, who approved it where an assumption change was needed, and the first period it applied to.

  3. Audit evidence

    Regulatory report data

    Allowance, provision and charge-off figures mapped to the loan categories used in your regulatory reports.

Request security information

Company-wide controls, data residency and subprocessors are described in our Trust Center, where you can send a request for security information.

Deployment

Where and how it runs

Moraph cloud

Hosted and operated by Moraph on Cloudflare's network.

With a managed service

Optionally run alongside a Moraph managed service for period-close support and platform administration.

Moraph Apps, and how the product is put together

Runs in Moraph Apps, the workspace shared by every Moraph-built product. Sign-in, roles, the audit trail, reports and the Work API are the same in every product; record types, fields, stages, roles and reports are configured for your organization during implementation, and anything beyond configuration is scoped as project work.

How a Moraph product is put together Your staff sign in once through the Moraph client portal and use the product in Moraph Apps, which runs on Cloudflare's global network and provides records, workflow, tasks, search, roles and the audit trail. The product's own services and your primary data run on Cloudflare too: the database is stored in one Cloudflare location and is not restricted to a jurisdiction. Your systems connect to the product through the Work API and the integrations agreed in the design. Your organization Your staffbrowser or mobile Your systemsyour existing software Cloudflare global network Client portalone Moraph sign-in, two-step, roles Moraph Apps records, workflow stages, taskssearch, reports, rolesaudit trailWork API (/api/v1) Moraph data on Cloudflare Product servicesthe product’s own processingand integrations Primary dataone database, not restrictedto a jurisdiction
How every Moraph product is put together. Sign-in and the shared workspace run on Cloudflare’s global network; the product’s own services and your primary data run there too, in a database that is not restricted to a jurisdiction. Each integration is specified in the design.

Security controls and data residency are set out in our Trust Center. Engagement models and what drives a quotation are on Working with Moraph.

Implementation

What a rollout involves

Every implementation follows the same phases, described on Working with Moraph. Their length depends on scope, so the plan in your proposal gives the dates.

  1. Discovery
  2. Design
  3. Implementation
  4. Migration
  5. Testing
  6. Go-live
  7. Ongoing operations

For IFRS 9 / CECL Impairment Calculator, the work involves

  • Data mapping

    We map your loan, collateral, charge-off and GL data to the Calculator's model and agree how each period's CSV or Work API load is prepared. We need historical data extracts and a contact from your core-system team.

  • History and pools

    Your historical loss experience is loaded and pools are defined with your credit and accounting teams, based on shared risk characteristics.

  • Methods and assumptions

    Methods, forecast scenarios, reversion settings, staging criteria and qualitative factors are configured to match your allowance policy, and documented for your model risk process.

  • Parallel periods

    The Calculator is run alongside your current process for the periods you choose, and differences are explained before you rely on it.

  • Workflow and roles

    Close steps, the checks that block sign-off and the journal entry, committee reporting and roles are set to match your governance.

  • Training and go-live

    Analysts, accountants, approvers and committee members are trained on their own steps, and the first live period is closed with Moraph staff available.

Release notes

Release history

IFRS 9 / CECL Impairment Calculator

Generally available
End of support
None announced. At least 12 months’ notice before any end of support.

No version history is published for this product.

What the stages mean, how versions work and our end-of-support policy: Product lifecycle.

Limitations

What it does not do

Worth knowing before you evaluate it.

  • The Calculator produces an estimate; the allowance recorded in your financial statements is your institution's judgment, approved by your own controller and committee.
  • Estimates depend on the quality and length of the loss history and portfolio data you provide. Where your own history is limited, peer or proxy data must be sourced and justified by you.
  • It does not produce economic forecasts. You supply scenarios from your chosen provider or your own economists.
  • It does not post to your general ledger directly; it exports a journal entry file for your team to post.
  • It does not perform fair value measurement or hedge accounting.
  • Methods and assumptions are configured to your policy during implementation; choosing them, and changing them, remains your decision.
  • Using the Calculator does not replace independent model validation or your auditor's testing.
  • It does not file regulatory reports; it produces the data your reporting team uses.

Evaluation checklist

What to test in a demonstration or pilot

Questions worth putting to us, and to any other vendor you are considering.

  1. Load an anonymized extract of one portfolio and its loss history, and compare the estimate with your last approved figure
  2. Ask an accountant to reconcile a period's data to the general ledger and record the differences
  3. Enter a qualitative adjustment and follow it through review and approval
  4. Run a sensitivity analysis on an adverse scenario and review how the result is presented to committee
  5. Rerun a locked period and confirm it reproduces the same figures
  6. Confirm role separation: who can propose, review and approve adjustments and the allowance

Questions

Frequently asked questions

Does it support both CECL and IFRS 9?

Yes. CECL lifetime estimates under ASC 326 and IFRS 9 staging with 12-month and lifetime losses are both supported, with the framework set on each pool.

Can we keep our existing methodology?

Usually, yes. Your current pools, methods and qualitative framework are configured during implementation, and the parallel periods show whether the results match before you rely on them.

Who decides the allowance?

Your institution does. The Calculator produces and documents the estimate; your controller and committee approve the figure that is recorded.

Where do the economic forecasts come from?

From the provider you already use or from your own economists. Scenarios are loaded each period and their weighting is recorded with the estimate.

How is it priced?

As a subscription, usually measured by the size of the institution or the portfolios covered, with implementation charged separately. See Working with Moraph for what drives a quotation.

Is there an accessibility conformance report?

Ask for one through the procurement request form at /how-to-buy/request, naming the version you are evaluating.